Total Site Development
Flagler Station 3 Phase 1 Infrastructure

Flagler Station 3 Phase 1 Infrastructure

LOCATION: Miami, Florida
OWNER: Flagler Development
CONTRACT: Over 5 Million

The 40 acre project is located within the Titan America quarry and aggregate plant facility. The project was a vacant property heavily wooded with malealuca trees. After we cleared the site, it needed to be flat filled to a certain elevation for future industrial development. The material being removed was black silt/peat material with sand, limerock and limesand underneath. We demucked 100,000cy of material onsite and removed 190,000cy of muck to an offsite area. We imported 173,250cy of good material from a 5.6 acre lake we excavated to a depth of 22 feet deep. This proved challenging due to the limerock underlain by the Fort Thompson formation.

Miramar Park of Commerce #27, #28 & Premiere Parkway

Miramar Park of Commerce
#27, #28 & Premier Parkway

LOCATION: Miramar, Florida
OWNER: Sunbeam Properties
CONTRACT: Combined work is over 25 Million

Ryan has completed many of the parcels within the Miramar Park of Commerce for Sunbeam Properties. These parcels are a continuance of work for a long time client and consist primarily of clearing and grubbing, construction of the building pad, site grading, site utilities including storm drainage, water and sanitary sewer. We also do all their site paving including the roadway subgrade and base courses, asphalt/concrete paving, concrete curbing, striping and signage.

Rybovich Spencer Marina

Rybovich Spencer Marina

LOCATION: Riviera Beach, Florida
OWNER: Centex Construction
CONTRACT: Over $3,000,000

In order for the new 2,000sf Marine Technical Center office facility to be completed, the existing 5 acre marina and boat yard facility required major modifications. To facilitate a 600 ton travel lift which picked the yachts from the water and placed them in the boat yard facility for maintenance or repairs, site utilities, earthwork and paving improvements were mandated. Precision was required in all aspects of the civil construction due to the tolerances determined by the travel lift operation.

US Customs & Border Patrol

U.S. Customs & Border Patrol

LOCATION: Dania Beach, Florida
OWNER: WSSA Florida, LLC
CONTRACT: Over $1,200,000

A government project which had a challenging earthwork component consisting of demucking, debris removal and importing of material in order to facilitate site access for the general contractor to begin construction of a retaining wall system and the building facility. With the close proximity of the Atlantic Ocean, dewatering was certainly thought-provoking and the success was proven by working closely with the Geotechnical Engineer.

Peters Elementary School

Peters Elementary School

LOCATION: Plantation, Florida
OWNER: Moss & Associates
CONTRACT: Over $1,200,000

School projects are extremely schedule sensitive and this project was no different. In order for the new Cafeteria / Multi-purpose Building to be completed prior to the school year beginning, extended working hours and work days were commanded. Our work consisted of existing site demolition, earthmoving operations, site utilities and both concrete and asphalt paving. Additionally, all of the preparation for the play court areas were done within our contract. This particular project won an award for “Excellent in Construction” from the ABC.

Pine Trails Park

Pine Trails Park

LOCATION: Parkland, Florida
OWNER: Padula & Wadsworth Construction
CONTRACT: Over $1,700,000

A Parkland facility, this project was Phase II of an existing park. Although our scope of work included the full site package for the construction of all parking areas as well as the building pad establishment, it also included the baseball fields and an amphitheater area. Brick pavers and header curbing gave the finished product a look that was suited for Parkland, Florida.

Cobblestone Plaza

Cobblestone Plaza

LOCATION: Miramar, Florida
OWNER: Kite Realty Corp.
CONTRACT: Over $6,300,000

Commercial shopping center with two anchors and adjacent retail. Ryan provided total site development for the owner including the clearing & grubbing, demucking, filling and site grading, sanitary sewer, lift station, forcemain, storm drainage, watermain, paving base course, asphalt and striping. Additionally all of the off-site improvements including maintenance of traffic required for utility improvements and turn lanes were completed within our contract.

JAFCO Assisted Living Respite Center

JAFCO Assisted Living Respite Center

LOCATION: Sunrise, Florida
OWNER: Anderson-Moore Construction Corp.
CONTRACT: Over $800,000

Our sitework scope consists of clearing and grading the site for a two-story 46,000sf main building with three 1,200sf one-story residence buildings. We did all the building pads, excavated retention areas, imported fill to balance the site and built berms and swales. The underground utilities consisted of water main, sanitary sewer main, underground rain tank system and storm drainage. We created a new parking area, pedestrian walkways, interior roads, curbs & gutters.