This 17 acre site was cleared and disked and all existing vegetation including topsoil was removed as well as existing asphalt, concrete, CBS wall, chain link fence, and other various debris. Next 164,000 cubic feet of underground drainage storage was installed with large diameter pipe to comply with onsite water storage requirements. Then thousands of linear feet of exfiltration trench was dug, we installed the water/fire line, and full sewer system which completed the utilities.