SFWMD CEPP New Waters A-2 STA Inflow Outflow Canal

3.5 miles of an Inflow/Outflow Canal, an adjacent Seepage Canal and associated levees along the North side of the future 6,500 acre A-2 Stormwater Treatment Area (STA).

LOCATION: Palm Beach County, Florida owner: South Florida Water Management District contract: $12,930,000

CONSERVATION

This work will improve the quantity, quality, timing and distribution of water flow from Lake Okeechobee to the St. Lucie and Caloosahatchee Estuaries, the Greater Everglades Conservation Area 3, Everglades National Park, and Florida Bay while maintaining flow control and water supply.

1.6 MILLION CUBIC YARDS

Blasting and canal excavation was over 1.6 Million cubic yards

500,000 CUBIC YARDS

The Levee embankment and sloping was over 500,000 cubic yards.

ENVIRONMENTAL PROTECTION

The project also included environmental protection, limerock roads and grassing.


contact us

get in touch

Let us take care of your SiteDeveloment needs. Call our office or send us a message and we will get right back with you.
Email Us: Marketing@ryanfl.com

LOCATIONS

Deerfield Beach Office

1700 S. Powerline Road, Suite H

Deerfield Beach, FL 33442

(954) 427-5599

Miami Office

14221 SW 120th Street, Suite 103

Miami, FL 33186

(305) 503-0479

Stuart Office

1239 SE Indian Street, Suite 110

Stuart, FL 34997

(772) 266-3200